the scheme.
Boom Power is proposing a new Battery Energy Storage System (BESS) located to the north of Uddingston and southeast of Bargeddie, approximately 12 km to the east of Glasgow city centre at the postcode G71 5PP. The proposed BESS will cover an area of 41.89 acres (16.95 hectares) and will connect the Clyde’s Mill substation in Cambuslang. The cable route will be determined and installed by Scottish Power Energy Networks (SPEN) and does not form part of our application.
Battery storage technology has a key part to play complementing renewable energy sources such as solar and wind. Supporting the grid with frequency response and reactive power before, during and after a fault on the grid. This would mitigate any risks of local blackouts on the local electricity network.
As Scotland transitions towards Net Zero, battery storage projects such as the one being proposed at Aitkenhead will make a significant contribution to meeting the country’s ambitious carbon reduction targets. North Lanarkshire Council declared a climate emergency in June 2019 and committed to achieving net-zero for North Lanarkshire by 2030. Battery storage projects will support the recognised need for a transition away from fossil fuels. On a national level, the Scottish Government is committed to achieving Net Zero by 2045 through a Just Transition which aims to create a better future for everyone. Renewable energy projects such as wind and solar power will play a significant role in this, but battery storage facilities will allow renewable energy to be stored and released when needed, optimising our electricity system.
megawatts of Low-Carbon
Electricity storage
FULLY
REVERSIBLE
DEVELOPMENT
Net Zero
Target
Preserved
public rights of way
Additional Trees
& Hedgerows
Planted
enhanced
biodiversity gains
All statistics shown are on an annual basis.
LOCATION – why here?
HARVESTING ENERGY IN BALANCE WITH NATURE.
Tackling climate change requires unprecedented and urgent action. To thrive, the UK will need to support the growth of new sectors. The transition to powering our homes and businesses with low-cost, low-carbon electricity generated from renewable energy sources is an essential part of the UK’s climate change strategy and needs to be delivered at pace and scale. Scotland needs BESS developments like this one, as well as many others, to carry out that transition and achieve its ambitions.
The first step for the identification of suitable site is to be close to a secured grid connection point which has spare capacity to enable development of a BESS site. Boom Power has engaged with the National Grid and Scottish Power Energy Networks (SPEN) to secure such a connection here.
To ensure the proposed development is economically viable and to minimise energy losses, the cable run will be kept at short as possible. This will reduce both costs and energy waste for sites located further from the grid connection point.
On securing the connection offer, we explored potential available land in the vicinity considering the main environmental and planning constraints. We also consider geographical and topographical considerations such as slope, aspect and access. Once potentially suitable locations have been identified, we engage with landowners in the area, to ascertain their interest in being involved with a BESS development. This process lead to the selection of the Aitkenhead BESS site.
The main environmental and planning constraint considerations include:
BENEFITS & DESIGN
DIVERSIFY FARMING.
North Lanarkshire Council declared a climate emergency in June 2019 and committed to achieving net-zero for North Lanarkshire by 2030, supporting renewable energy developments within their Local Development Plans. The proposed BESS will contribute to progress towards local climate change goals, as well as wider national targets. By optimising the use of renewable electricity and helping to balance the grid, battery storage projects are providing for a more secure future for everyone.
As part of the project’s design, there will be new planting and landscaping around the development to soften its appearance and reduce any visual impacts. This planting will in turn lead to a significant enhancement of biodiversity compared to the current levels.
We anticipate the construction of this scheme will take approximately 12 months. Local highway restrictions will be followed, and a construction traffic management plan will be agreed with the local highway authority and Transport Scotland to ensure our construction plans are appropriate.
Boom Power recognises the importance of ensuring the local community benefits from this development, and as such, will be looking to bring forward a community benefit fund with this project. This fund will seek to support a variety of local initiatives that meet broad criteria generally in line with local energy, climate change, environment, ecology and sustainability objectives.
In addition to the community benefit fund, the BESS will provide local employment opportunities through the development and construction phase, as well as generating millions of pounds in local business rates once operational to support local services.
It is anticipated that consumer electricity demand will continue to rise rapidly in Scotland, and across the UK, with some researchers suggesting a 50% increase by 2035. This increase is being driven in large part by the electrification of transport, as petrol / diesel vehicles are replaced by electric ones, and heating, as gas boilers are replaced by heat pumps. To support this increase in demand, battery systems, such as that being proposed here, ensure the energy we generate can be used in a more efficient way. BESS allows our energy to be stored at times of low demand, and then discharged later, at times of peak demand. Currently, this balancing function is being fulfilled by traditional peaking power plants that rely on fossil fuels, such as gas. There is a move across the globe to replace these with battery storage systems, such as that proposed here today.
The complete battery system is extremely advanced with cutting edge technology, but when broken down, the individual lithium-ion battery cells are exceptionally similar to those found in many products, such as battery drills, battery hoovers and even battery cars, the difference being that there are many thousands of them grouped and managed together. The batteries are housed in a container, such as that depicted. There will also be associated electrical infrastructure on the site, to supports the safe and secure operation of the batteries.
Battery storage is either coupled to renewable energy sources or it is directly connected to the electricity network. This project is a standalone facility directly connecting to the grid. At times when there is surplus electricity available, the batteries are charged, this allows the energy to be discharged or called upon by the electricity network on demand for both emergencies and grid balancing (keeping the grid stable, responding to sudden changes or fluctuations). Additionally, this would be to simply meet the daily peak demand, usually around 6pm when most cookers, kettles and even 1st generation battery cars and chargers all start demanding electricity.
Have your say
Your Opinion Matters.
At Boom Power we are committed to ensuring that we remain open and engaged with the community regarding our proposal. We believe that retaining a transparent approach throughout the development process with those in the surrounding communities is crucial to achieving a brighter future for us all.
Your opinion matters, and every response to this consultation will be considered, evaluated, and used to develop our final design.
You can share your thoughts by completing our feedback form online. Please note the feedback form will be available from 00:00 on the 4th September 2024.
Alternatively, if you have a general enquiry please contact us using the dedicated contact form provided, email us directly at aitkenheadbess@consultationonline.co.uk or call our phone line on 0800 066 8943 between the hours of 9am-5pm, Monday to Friday.
If you have any questions or would like to request copies of information (including in accessible formats if needed) please contact us using the general contact form button.
The consultation closes on the 16th October 2024 at 23:59. All responses received before this will be considered and summarised in our consultation report. Responses received after this time may not be considered.
Contact the Aitkenhead BESS team.
* Field required.
If you would prefer to speak to one of our team, please call 0800 0668 943 between the hours of 9am – 5pm Monday to Friday.
By using this registration form you are abiding by the Boom Power Ltd Privacy Policy and Terms and Conditions.
This registration form is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.